Pole Specifications
|
Single Phase Pole SpecificationsThree Phase Pole Specificationsx3 (10amp) triple outlets |
We supply and install the Single & Three phase poles.
|
Pre – Install Requirements.
|
We require all paperwork to be filled out and sent back to our office for prompt delivery and set up.
Marking out on site the position of the pole, clear of any trees or underground services (please note we may refuse installation and further cost may be incurred if this process is not complete. We also do not take any responsibility to services damaged in this process). Access to our poles is required at all times and an exclusion zone of 3 meters is required around the pole for safe work practice. |
"Requirements for using builder’s temporary supply poles"
|
ESV has produced these requirements to assist the electrical and building trade with the minimum requirements for the installation of construction electrical supplies using a builder’s temporary supply pole (BTS).
Should the builder’s construction supply use the building’s permanent consumer mains and switchboard/meter enclosure, please refer to the ESV Builder’s construction supplies – Temporary in permanent position requirements page on the ESV website. |